Flare · 0.4 MMscf/dPilot only · on target
Compressor B · driftingAlert in ~2 days · WO raised
118 of 130 on boardCrew change 09:45
Operations platform for offshore assets
Run every offshore asset from one live picture.
Ballast connects production, equipment, integrity, permits, drilling and people into a single live model of each platform, rig and FPSO.
- Kestrel AlphaLive
- 41.2kbbl/d
- Production efficiency
- 91.6%
- Open alerts
- 31 critical
- Weather window
- 8 hcrane ops
KESTREL ALPHA 41.2 kbbl/dBRISA FPSO 88.5 kbbl/dHALYARD day 14 of 31ARDENT 2,140 m MDCORRAN HUB shut-inCOMPRESSOR B 6.2 mm/sFLARE 0.4 MMscf/dHS 1.8 mWIND 18 kn SWPOB 118 / 130PSV SKERRY FOX ETA 06:30KESTREL ALPHA 41.2 kbbl/dBRISA FPSO 88.5 kbbl/dHALYARD day 14 of 31ARDENT 2,140 m MDCORRAN HUB shut-inCOMPRESSOR B 6.2 mm/sFLARE 0.4 MMscf/dHS 1.8 mWIND 18 kn SWPOB 118 / 130PSV SKERRY FOX ETA 06:30KESTREL ALPHA 41.2 kbbl/dBRISA FPSO 88.5 kbbl/dHALYARD day 14 of 31ARDENT 2,140 m MDCORRAN HUB shut-inCOMPRESSOR B 6.2 mm/sFLARE 0.4 MMscf/dHS 1.8 mWIND 18 kn SWPOB 118 / 130PSV SKERRY FOX ETA 06:30
Why it matters
Offshore rarely fails all at once. It drifts, quietly, until something trips.
27days
of unplanned downtime per offshore operator, every year.
Kimberlite for GE Digital, 2016
$38M
average yearly cost of that downtime. Up to $88M.
Kimberlite for GE Digital, 2016
35%
or more of offshore downtime comes from unplanned maintenance.
OEUK via Alvarez & Marsal, 2026
27%
of planned maintenance hours found to add no risk reduction.
Lloyd's Register, ONS 2026
Operations centreOnshore and offshore, looking at the same screen.
The onshore control room and the offshore laptop run the same live model. Nothing is exported, so nothing goes stale.
One asset modelTags, equipment, barriers, permits and people, linked.
Read-only by designConnects to what you run. Never writes to control systems.
Works at the edgeKeeps running offshore when the satellite link drops.
Loading model
The digital twinOne model of the asset. Everything pinned to it.
Blender render · illustrative asset
41.2kbbl/d
118/130 POB
31 crit
ProductionPeopleAlerts
Inside the product
Seven screens your crews open every shift.
Live screens, not pictures. Point, click and drag inside the display, or open one full size.
Rotating equipmentThe turbine, on the engineer's laptop.
Output, exhaust spread and bearing temperatures, with the same live readings the control room sees.
21.7 MWLive output, GT-A
18 °CExhaust spread
0Writes to control systems
Asset typesA ready model for every kind of offshore asset.
How it worksLive in weeks. Nothing ripped out.
01 · ConnectConnect what you already run
Read-only connectors to your historian, maintenance, permit and drilling systems.
AVEVA PISAP PMMaximoWITSMLOPC UA
02 · ModelBuild the asset model
Tags, equipment, barriers and permits mapped onto a template for your asset type.
6 asset templatesYour tag names
03 · OperateOperate from one picture
Modules, alerts and cited answers for crews offshore and engineers onshore.
WebControl room wallTablet
Ballast AIAsk the asset. Check the answer.
Every statement is cited to the tag, work order or document it came from. No source, no answer.
- AGrounded in your data, never the open web.
- BRead-only. It drafts work orders. It never touches control.
- CPermission-aware, per user.
Ask Kestrel AlphaGrounded in your asset data · read-only
Live
Ask about any tag, work order or permit
SecurityBuilt for OT security teams.
It must survive a dropped satellite link, and it must never write to a control system.
Read-only by design
No write path to DCS or SIS. Zoned to IEC 62443 conduits.
Edge plus cloud
An edge node offshore, delta sync over VSAT or LEO.
Data residency
Choose the region for each asset's data.
Full audit trail
Every permit, override and AI answer logged.
IEC 62443 Designed forISO 27001 PlaceholderSOC 2 Type II PlaceholderSSO · SAML · SCIM
Brisa FPSO · fictional asset
Customer story
"For the first time, the night shift and the onshore engineers looked at the same chart instead of arguing about whose numbers were right."
Offshore Installation Manager, Brisa FPSO Illustrative
13 h
compressor restart, down from 2 days
Book a demoSee it on your own asset.
We connect read-only to a sample of your data and walk your team through a real shift. About two weeks from kickoff.